Floor cutting, dock modifications and trenching in live facilities — how to keep operations running.
Warehouses rarely shut down for construction. Floor sawing for new drainage, dock leveller pits, conveyor foundations or racking changes has to happen around shifts, inventory and forklift traffic — with dust controlled so product stays clean.
Night and off-peak scheduling, zoned work areas, water-fed dust-controlled cutting, and fast removal of cut concrete. Multiple crews let us compress schedules when a shutdown window is measured in hours.
Share the layout, the operational constraints and the deadline. We plan cut sequencing so aisles reopen as sections complete, and we leave each zone broom-clean for traffic the same shift where possible.
Have this exact project?
Send photos for a free review, or call the 24/7 line.
Free Site Estimate — No Obligation
Tell us about your project. Free online quotes and free on-site estimates across Ontario and Quebec — with 24/7 emergency response when it cannot wait.
Prefer email? Send drawings & project details tobluehorsebuilds@gmail.com