Floor cutting, dock modifications and trenching in live facilities — how to keep operations running.
Warehouses rarely shut down for construction. Floor sawing for new drainage, dock leveller pits, conveyor foundations or racking changes has to happen around shifts, inventory and forklift traffic — with dust controlled so product stays clean.
Night and off-peak scheduling, zoned work areas, water-fed dust-controlled cutting, and fast removal of cut concrete. Multiple crews let us compress schedules when a shutdown window is measured in hours.
Share the layout, the operational constraints and the deadline. We plan cut sequencing so aisles reopen as sections complete, and we leave each zone broom-clean for traffic the same shift where possible.
Have this exact project?
Send photos for a free review, or call the 24/7 line.
Soumission Gratuite — Sans Engagement
Parlez-nous de votre projet. Soumissions en ligne et estimations gratuites sur site en Ontario et au Québec — avec service d’urgence 24/7 quand ça ne peut pas attendre.
Vous préférez le courriel? Envoyez plans et détails de projet àbluehorsebuilds@gmail.com